Preparation of drill rig prior to installation
of Monitoring Well, MW-1.
Split spoon of soil collected at depth of
35'-37' from MW-1 borehole.
Drilling and installation of Monitoring Well MW-2 via hollow stem
auger drilling
method.
Preparation of drill rig prior to installation of Monitoring Well MW-4.
Split spoon of soil collected at depth 35'-37' from MW-4 borehole.
Collection of soil sample from MW-4 split spoon for EPA Method 8021.
Sampling of groundwater from MW-4 with a disposable bailer.
Building
of new Walgreen's.

